Saturday, March 26, 2011

Gwinnett Gladiators Game 3/26/2011 More Pics

The puck drop:

Troopers on ice!The Turner\Cartoon Network folks:

Victory!

R2 got his sweater!

Gwinnett Gladiators Game

R2 and the Ga501st had an event sponsored by Turner and the Cartoon Network for the season finale of Star Wars the Clone Wars.

Ceremonial first puck drop:



Friday, January 14, 2011

Working with Lexan

While working on my electronics panel, I needed to add a bunch of hole that were close together and a few large holes. Lexan likes to chip if you drill it and break if it is near other holes. To get the holes I needed I used a spade hole bit for drilling holes in wood. Set to low speed it made short work of the Ledxan without any ninding or chipping. I could get the holes as close as i wanted.

Thursday, December 9, 2010

Star Wars Charity Event

Pictures from the Lucas Film Charity event held in Atlanta.



Tuesday, September 15, 2009

I can see the light...

Well a lot has been going on. The electronics work is about 80% done. The dome is about 90% done since I just have to finish cutting the dome panels and the front logic displays. The Rear logics are mounted, but they still need the fiber optic conversion. The logib displays on are hold until I can get more bezels for them. PSIs are now done. The outside of the droid only needs the battery harnesses, flat side plate, side vents, and a mounting system for the center vent surrounds to be complete. He is now pushing 175-200lbs fully loaded. I have to figure out hwo get him in a weigh in.

Wednesday, July 15, 2009

Lots going on, no pictures...

R2 was taken completely apart and pieces were ground down and adjusted to make way for electronics. The feet now have the NPC motors mounted and new wires pulled up the through the new holes in the feet and legs. The wires currently are just pulled into the body. The new electronics panel was cut out of 1/4" Lexan and mounting brackets were made to fit it to the frame. Some of the vertical rods on the frame were moved back to allow room for the hinges for the doors on the skins. All this done in a weekend. I now jsut have to positions the motor controllers and fuse blocks wire them up and R2 should be moving. Then I need to finish cutting the inner dome for the hinges and the dome can go back together.

Thursday, May 14, 2009

R2 is almost talking

I just finished the setup of the sound system. The system consists of a VMusic2, Arduino, and speakers. I formatted a USB drive and updated the firmware on the VMusic2. I then created sound files for each sound and put them on the USB drive and created a little sketch to play all the sounds on the drive. I jsut have to write a little more logic to control the sounds through my Wii nunchucks and then install all the wiring in the droid