Wednesday, September 3, 2008

Status Update

Well DragonCon is over. I only spent a day there, but I did get some R2 building done. I made a major push to get some things complete. Over the weekend I shaved the center ankle mounting block down adn now the center foot is mounted. I finished painting all the feet, ankles, and legs. This includes all the blue parts too. The Radar Eye is also painted blue too. I then moved to the dome where I cut the large hole for the 1 piece Front Logic Port (FLP). I then drilled and counter sunk screws for the FLP, Rear Logic Port, and all Holoprojectors. He is now looking more like a complete R2 droid.

Photos coming soon....

Wednesday, August 27, 2008

Leg to Ankle Upgrade

Well the leg to ankle upgrade is complete, well sort of. I plan on adding a 1/8" plate that will run all the way down the ankle to the axle, but for now there are just some nuts JB Welded to the ankle. i used Grade 8 bolts to ensure that they would not shear and drilled out the ankles and legs to fit the new bolts.

I JB Welded nuts to the plate inside the ankle to give the bolts something to screw into. As mention before, one set of nuts is there until I create the 1/8" plate. Right now they only keep the leg in place.

I got some 1/4" aluminum plates and drilled them so they will fit between the leg and ankle and keep the correct spacing on the bracelet.



All Assembled

Sunday, August 10, 2008

Weekend Update 2

Finished drilling the shoulder hubs. I JB Welded some rare earth magnets in the holes. They are now ready for mounting. I just need to attach some magnets on the legs. It will be interesting to see how the JB Weld reacts with the magnets. You can acually see the JB Weld interact with the magnetic fields.

I finished the final foot shell, and applied some white primer to the shells. I also cut all the craided hose and tubes. I now need to cut the nuts that will hold the KHFs on the feet.

Tuesday, July 22, 2008

Ankle Details

Nothing special today. During lunch I went to check out an Ace near my work. It turns out the Ace is fully stocked in screws and hardware. I picked up a bunch of new screws and lock washers to mount he ankle details. These replaced the hex socket cap screws that came with the hardware.

I plan on going back tomorrow to get some more screws and other hardware for some ideas I have to mount the other details on the legs.

Sunday, July 20, 2008

More Foot Work

Rounding out the weekend, I decided to work on the feet some more. I marked out the holes in the side of the foot shells for the motor mounts. I then cut the holes out using my Dremel. I then mounted the motor mounts and marked and drilled the holes to mount them to the foot shells.


I decided to also take a look at the under the shoulder details. I drilled a small hole to tap a threaded rod into. I will cut a hole in the legs to allow me to use a wing nut to attach the detail to the legs.

Saturday, July 19, 2008

Booster Mounting

Toady I decided to mount eh booster covers on the legs. I have some older legs that do not have the keyhole slots sut in them, so I had to make my own mounting system. First I fitted everything together and marked out where the boosters sit on the leg. I used the center strut as a guide.


Next I measured where the holes where on the booster and marked them on the legs.

I then double checked my measurements with the blueprints and I even put a piece of paper on the boosters and punched holes in it where the screws go. I then lined the paper on the legs, just to triple check everything. I drilled the holes for the screws and then drilled a larger hole .375 inches above the smaller ones. I used a small thin hack saw blade to cut teh connecting piece between the two holes. Once I had a channel between the two holes I filed the channel flat.