Busy build weekend. The first thing I worked on is cutting 1 of the braided hoses and testing out the KHF. It looks like I will need to cut the hose a little longer as the braided hose expanded a little and shortened the length as I put a section of tube in side.
I moved to putting a coat of white primer on the center foot. This is just a base coat for the foot since I plan on using Satin White later, but I already used a gray primer to stop any rust on the foot. The white primer will cover up the gray one better.
I needed to put the mounting screws in the battery boxes so I can start figuring out how to attach the boxes so they don't rattle. I marked the location of the holes and then drilled and tapped them.
Next I drilled and tapped the ankle cylinders so the wedges can attach to the cylinders. I lined up and measured the first cylinder and made a jig to do the other 3. A few adjustments need to be made before the cylinders and attached wedges can be moutned on to the ankles. I expanded a few holes, but the center ankle has one wedge combo that is really going to need some fitting.
I primed and test sprayed a piece of scrap to test the Krylon X-Metal purple as an alternative to the elusive Rustoleum. More to come on that.
The last thing I worked on was mounting the LDP to the frame. I mounted the LDP and marked it's location. I then drilled and counter sunk holes for screws. I now just have to drill and tap holes in the LDP.
Hollywood Christmas Parade - 2024
-
Tonight was the 2024 Hollywood Christmas Parade, and for the 8th time R2
joined in on the festivities. As I neared Hollywood and Highland, I tried
to get a...
2 weeks ago
No comments:
Post a Comment