I mounted the rockler bearing on the top ring. I had mounting holes on the top ring, but they got in the way of the shoulder hubs and the large data port. I had to drill out the other holes on the outer bearing and drill new holes in the top ring. I then tapped the ring and reassembled. This should be the last time the frame needs to be taken apart for some time.
I also filed down the last ankle wedge. These things just didn't line up at all. I don't really think the wedges are the problem. I think there were some issues in the production of the ankles where some durfaces are not completely flat and the angles are off.
I have a few thing on my list to try and get done this weekend. Ipdates and pictures coming...
Hollywood Christmas Parade - 2024
-
Tonight was the 2024 Hollywood Christmas Parade, and for the 8th time R2
joined in on the festivities. As I neared Hollywood and Highland, I tried
to get a...
2 weeks ago
No comments:
Post a Comment